Simple equipment. Reliable field data.
Prepare a USB-C device, tested cable pack, two firmly installed ground pegs and the correct impact hammer. Then follow a consistent ten-impact recording sequence at every field point.
The complete field kit
GeoVue is designed around low-cost, readily available equipment. The quality of each connection and the consistency of the field setup are more important than carrying complex instrumentation.
USB-C phone or tablet
Use a late-model device with a functioning USB-C port, GPS capability, adequate battery charge and the GeoVue app or web interface available.
Tested cable pack
Purchase the components listed on the Cables page, build the cable carefully and complete both cable tests before field use. Carry a spare set.
Two stainless steel pegs
Use two approximately 16 mm diameter, 750 mm long stainless steel rods linked by a two metre nylon separation rope.
Impact hammer
Select the hammer size for the planned investigation depth and maintain a consistent, controlled ground impact at every field point.
Install the pegs firmly and keep the spacing fixed
Drive both pegs into the ground so they are stable and in good electrical contact with the soil. The two metre nylon rope maintains the correct separation. Approximately 150 mm of each peg is shown in the ground, leaving enough exposed metal for secure crocodile-clip attachment.
Choose the hammer for the target depth
The hammer provides the impulse used to create the electro-seismic response. Use a deliberate, repeatable strike on the ground surface—not on the peg, cable or connector. The illustrated equipment guide associates larger hammers with deeper investigations.
Field workflow
Complete these steps in order. A repeatable setup makes results easier for the app to assess and reduces avoidable re-recording.
Prepare a USB-C device
Use a late-model phone or tablet. Charge it fully, confirm GPS access and make sure the USB-C port is clean and undamaged.
Create your GeoVue account
Register at geovue.cloud, sign in and confirm that the account is ready before travelling to the site.
Build your job
Create the project and field points in advance. Save the job and prepare any offline requirements before leaving internet coverage.
Purchase the cable components
Use the equipment specified under Cables, including the correct USB-C DAC adapter, leads, plug and clips.
Make your cables
Assemble either the hard-wired or screw-terminal option. Add strain relief and ensure the red and black connections match the cable guide.
Test every cable
Complete the voice-recorder and Bluetooth cancellation checks described in the cable guide. Do not take an untested cable into the field.
Install and connect the pegs
Place the pegs two metres apart, drive them firmly into the ground, then attach the black and red clips securely to clean exposed metal.
Connect the recording device
Connect the cable pack to the device through the USB-C DAC adapter. Open the correct job and navigate to the planned field point.
Ten impacts, two seconds apart
Once recording has commenced, hit the surface of the ground ten times. Maintain an approximately two-second gap between impacts and keep the strength and position of each strike as consistent as possible.
Pack and move on
Watch the device screen. When the data is approved, remove the clips and pegs, pack the equipment and navigate to the next field point using the guide in the GeoVue app.
Shift one metre
Move the entire field point approximately one metre, reinstall both pegs with the same separation, reconnect the equipment and repeat the ten-impact sequence.
Keep shifting. A clean position can usually be found.
Declines are normally caused by local subsurface or electrical noise rather than a problem with the GeoVue process. Move the complete setup one metre at a time and retry. Keep both peg spacing and cable connections unchanged.
Field safety comes first
Wear suitable eye, hand and foot protection. Check for buried services before driving pegs or striking the ground, maintain safe clearance from overhead lines and electric fences, and keep other people outside the impact area. Follow all local site procedures and equipment manufacturer instructions.