GeoVue cable construction instructions
GeoVue field equipment

GeoVue cable construction instructions

Build a GeoVue field cable using the approved RS PRO AV cable, Mueller crocodile clips, heat-shrink tubing and UGREEN USB-C audio adapter. Follow the component guide, wiring diagram and video tutorial to assemble and test the cable before field use.

  • Choose the specified components and purchase from a supplier in your region.
  • Follow the wiring diagram for the black and red lead connections.
  • Verify continuity and insulate the joints before field use.
Phone connected to the GeoVue cable assembly with red and black crocodile clips
01 / Approved components

Build the cable from these reference parts.

These reference parts are used to assemble the GeoVue cable. Use the product numbers to select the correct components.

UGREEN USB-C to 3.5 millimetre female audio adapter
UGREEN DAC adapter

USB-C to 3.5 mm audio adapter

Connect the cable to a USB-C phone or tablet using an active UGREEN audio adapter with a DAC and TRRS microphone support. The 3.5 mm socket accepts the completed cable plug.

Amazon US ↗
Black Mueller crocodile clip
Mueller BU-115-0

Black clamp

Approved black crocodile clip used for the black field lead.

View supplier ↗
Red Mueller crocodile clip
Mueller BU-115-2

Red clamp

Approved red crocodile clip used for the red field lead.

View supplier ↗
RS PRO 3.5 millimetre to three RCA AV cable
RS PRO 832-6278

3.5 mm to 3 × RCA AV cable

This AV cable provides the four-pole 3.5 mm plug that connects to the UGREEN adapter. The cable conductors are prepared and terminated with the black and red clamps.

View supplier ↗
RS PRO 226-9109

Black heat-shrink tubing

Use this sleeving to insulate and strain-relieve the modified cable connections after the soldered joins are confirmed.

View supplier ↗
Completed GeoVue cable assembly with UGREEN adapter and crocodile clips
Reference assembly

Finished cable arrangement

The finished layout is phone or tablet → UGREEN USB-C adapter → approved modified cable → black and red field leads → crocodile clips.

See layout ↗
Important: The AV cable, clamps and heat-shrink are the approved reference parts. The UGREEN adapter is a required companion item and should be an active DAC-equipped USB-C audio adapter.
Overview showing the cable and clamps
02 / Layout overview

How the cable connects

The UGREEN adapter plugs into the phone or tablet and presents a 3.5 mm female TRRS socket. The approved cable build plugs into that socket and terminates in the black and red crocodile clips used in the field.

1. DeviceUse a supported phone or tablet running the GeoVue workflow.
2. UGREEN adapterConnect the USB-C DAC adapter first.
3. Approved cableInsert the modified RS PRO 832-6278 cable into the UGREEN adapter.
4. Electrode clipsAttach the black and red clamps to the field electrodes or ground pins required by the procedure.
03 / Instructional video

Watch the cable construction video

Follow the full demonstration for preparing conductors, making the connections, applying heat-shrink and checking the finished assembly.

Before constructionWatch the demonstration before cutting the cable.
During constructionPause during conductor identification and check continuity before fitting heat-shrink.
Before field useVerify the cable connections and test the finished assembly.
04 / Wiring diagram

Cable wiring diagram

The wiring diagram identifies the two connected contacts on the 3.5 mm TRRS plug and the corresponding red and black leads.

GeoVue field cable wiring diagram showing the 3.5 millimetre TRRS plug and red and black leads
Connection summary

Key mapping from the diagram

Only two contacts on the 3.5 mm TRRS plug are connected. The remaining contacts are left unused.

TipNo connection.
Ring 1No connection.
Ring 2Black lead connects here.
Sleeve / groundRed lead connects here.
Cable lengthsThe diagram specifies 1.5 m black 1 mm silicone cable and 1.5 m red 1 mm silicone cable with strain reliefs.
Verification: Confirm the contact assignments with a meter before shrinking the insulation, and follow the construction video for the assembly sequence.
Rotated full tools image showing cutters, cable, clips, probes, meter, soldering iron, heat gun and heat-shrink
05 / Tools and preparation

Tools for cable construction

Prepare the conductors, make secure connections, insulate the joints and check continuity using the tools shown.

Cutters and pliersFor trimming the cable and preparing the conductors.
SolderUsed when joining the selected cable conductors to the clip leads.
Multimeter / testerFor continuity checks and wiring verification.
Soldering ironFor making reliable low-resistance joints.
Heat gunFor shrinking the insulating sleeving over the finished joints.
Heat-shrink tubingCut short sleeves before starting so they are ready when the joints are complete.
06 / Regional purchase links

Buy the parts by region

Each regional group below includes the approved clamps, cable and heat-shrink, plus a purchase link for the UGREEN adapter.

Africa · South AfricaVerified RS South Africa listings for the approved cable parts
United StatesNorth American availability for the approved parts and Amazon link for the UGREEN adapter
CanadaCanadian clamp sources plus reference RS PRO listings and a direct Amazon Canada adapter link
Europe · United Kingdom / EUUK RS storefront plus Amazon UK for the UGREEN adapter; EU visitors can switch countries from RS global
AustraliaRS Australia for the approved build parts and Amazon Australia for the UGREEN adapter
New ZealandRS New Zealand for the approved build parts; Amazon Australia is the closest common regional Amazon storefront
Regional note: For Europe, customers outside the UK can use the RS global country selector if needed. For New Zealand, the UGREEN adapter is linked to Amazon Australia because it is the closest common regional Amazon storefront.
07 / Final checks

Test every completed cable before field use.

Run these checks after assembly and before the cable goes into service.

✓Continuity matches the wiring diagram.
✓No continuity exists between the red and black crocodile clips when they are not touching.
✓The device recognises the adapter and the completed cable interrupts normal Bluetooth audio playback.
✓All exposed joints are fully insulated and strain-relieved with heat-shrink.
Safety: Connect the clips only as required by the GeoVue field procedure. Do not connect this cable to mains wiring, batteries or any energised source.
Completed GeoVue cable assembly
GeoVue cable construction

Components, wiring, assembly and testing